Looking good.
I'm doing a similar 28x36. Rafters instead of trusses and three bays on the front .
Hole gets dug as soon as the septic system passes. (4 foot foundation, here)
Shingles are slippery when wet, too.
I've torn off a gutter and landed on wet soft grass just 8 feet. Much better than a cardbboard box and trying to grab something on the way down.
Wish I had the time to do it all myself.
I even like the finish carpentry.