Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Time to rip out the bathroom...
#1
So I'm doing a partial remodel of one bathroom in my house. New floor, vanity (sink, counter top and cabinet) faucets, medicine cabinet / mirror, light fixture, switches/outlets and paint. Also plan on putting new hardware on the door(s) and possibly painting them at the same time. The bathtub stays for now.

The current setup is a lovely off-white with stenciled leaves on the walls, an 80's era brown cabinet with a particle board counter top that is beginning to swell from moisture, and a sink that has seen better days. Matching (ugly) faucet and laminate floor tiles. See below:





I know this will take all weekend, if nothing goes wrong 8-). Wish me luck. Will post pics of the process later if anyone is interested.
Reply


Messages In This Thread
Time to rip out the bathroom... - by mikebw - 07-27-2007, 03:50 PM
Re: Time to rip out the bathroom... - by iaJim - 07-27-2007, 03:54 PM
Re: Time to rip out the bathroom... - by dmann - 07-27-2007, 04:25 PM
Re: Time to rip out the bathroom... - by mikebw - 07-27-2007, 05:00 PM
Re: Time to rip out the bathroom... - by bukowski - 07-27-2007, 06:07 PM
Re: Time to rip out the bathroom... - by billb - 07-27-2007, 07:00 PM
Re: Time to rip out the bathroom... - by TLB - 07-27-2007, 07:11 PM
Re: Time to rip out the bathroom... - by mikebw - 07-27-2007, 07:24 PM
Re: Time to rip out the bathroom... - by mikebw - 07-27-2007, 07:27 PM
Re: Time to rip out the bathroom... - by MikeF - 07-27-2007, 09:23 PM
Re: Time to rip out the bathroom... - by mikebw - 07-29-2007, 05:02 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)